Concreteness and values
The construction of this 3600 m2 production facility with double-span beam gantry with electrically welded trusses of variable section, has required Menon to search for the best construction solutions. In particular, we created a masking by means of micro-stretched aluminum sheets with rhomboidal mesh, which were later colored, in order to conceal the visual encumbrance of the building, which is located in a particular environmental context. We used Hi-Bond collaborating sheet metal slabs to complete this three-storey office building, which is externally padded with steel/glass walls.