Buildings for production

Industrial buildings – Fonzaso (BL)

A strong network

This industrial building, with its rigorous and essential lines, has been constructed in three bays with 20-metre spans, while the roofing trusses have been produced using a welded web solution. The trusses themselves were workshop preassembled and the tie-bands welded beforehand to the upper and lower chords.

This kind of attention, common across sites, makes steel construction even more expedient as it considerably reduces on-site time commitments. Included in the structure are the wall-plates for the bridge crane track ways and the articulated wind-brace joints of the walls.

Download +
Menon Costruttori